Skip to content
Client:

Castleton University

Location:

Castleton, VT

kW Installed:
9.9 kW DC
Our Work:

9.9kW ground mount outside the Jeffords Center at Castleton University.  Just in front of the solar array, a Chargepoint Level II EV Charger was installed, accessible from the staff and student parking lots.   Part of an EV Charger Grant from Green Mountain Power.